Delivery sequence
Loads are planned around the order in which elements are required for assembly.
Astra treats logistics and installation as part of the precast system, coordinating element readiness, transport, lifting access and the sequence required on site.

Precast elements must arrive in the right sequence, with the right access and an agreed plan for lifting, temporary support and connection. These requirements influence production and transport as much as they influence the site team.
Astra coordinates the transition from factory to structure so delivery priorities, site readiness and installation requirements are considered together.
Loads are planned around the order in which elements are required for assembly.
Lifting positions, movement routes and working areas are considered before delivery.
Element orientation, temporary requirements and interfaces are planned around the approved installation method.
The installation plan depends on the project, approved method and site conditions. Astra keeps each stage connected to the wider programme.
Review production release, site conditions and the information needed for placement.
Organise loads to support the approved installation order.
Align access, crane planning and element handling requirements.
Coordinate placement and connection activities with adjacent work.
Astra’s services are designed to work as one coordinated delivery model rather than disconnected packages.
Share the scope, location, programme and technical requirements so the team can begin the right conversation.