Approved fabrication information
Production is organised around coordinated project drawings and agreed requirements.
Astra coordinates fabricated steel components and assemblies around approved project requirements, production planning and the interfaces that matter during installation.

Successful fabrication depends on more than producing an individual component. Geometry, connections, access, handling, transport and site interfaces influence how the work should be detailed and sequenced.
Astra’s integrated approach keeps fabrication connected to engineering and delivery planning, helping reduce avoidable handover gaps between design information, production and installation.
Production is organised around coordinated project drawings and agreed requirements.
Connections to concrete, adjacent steel and site work are considered during development.
Component size, access, transport and placement are included in planning.
Each project has different structural and fabrication requirements. Astra coordinates the work around the approved scope and programme.
Translate approved requirements into practical fabrication information.
Organise fabrication around materials, checks and delivery priorities.
Consider dimensions, handling points and route constraints.
Align placement and connection requirements with project readiness.
Astra’s services are designed to work as one coordinated delivery model rather than disconnected packages.
Share the scope, location, programme and technical requirements so the team can begin the right conversation.